{"id":5761,"date":"2016-04-29T10:57:25","date_gmt":"2016-04-29T10:57:25","guid":{"rendered":"http:\/\/localhost:8080\/imesapi\/?p=2539"},"modified":"2018-10-04T06:53:01","modified_gmt":"2018-10-04T06:53:01","slug":"eficiencia-energetica-en-nave-de-pintura-factoria-de-automocion","status":"publish","type":"post","link":"https:\/\/www.imesapi.es\/en\/eficiencia-energetica-en-nave-de-pintura-factoria-de-automocion\/","title":{"rendered":"Energy Efficiency in Paint Building \u2013 Automotive Factory"},"content":{"rendered":"<p>[vc_row][vc_column css=&#8221;.vc_custom_1538635858111{margin-bottom: 35px !important;}&#8221;][vc_custom_heading text=&#8221;Description of the Project&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_separator css=&#8221;.vc_custom_1538635865846{margin-bottom: 35px !important;}&#8221;][vc_column_text]The project consists of the revamping and improvement in the design of auxiliary equipment and systems linked to the HVAC of a building where the painting process of truck cabins is carried out, within the Madrid factory of an automotive multinational. The surface and volume to be conditioned is 6,700 m<sup>2<\/sup> and 38,000 m<sup>3<\/sup> respectively.<\/p>\n<p>A total of five rooftop air handling units (UTA) are installed for the diverse areas of the building, taking into account the specific air renewal needs of each one (e.g. 30 m<sup>3<\/sup> \/ h in paint mixing rooms).<\/p>\n<p>The set of actions, i.e. the new HVAC units, their centralized management system, the replacement of the entire network of both overheated water pipes (760 m), and the air ducts for diffusion (3,000 m) and the insulation of all of them result in energy savings of more than\u00a0 34%, with a reduction in CO<sub>2<\/sub> emissions of 300 t \/ year.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_custom_heading text=&#8221;Photo Gallery&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_separator css=&#8221;.vc_custom_1538635874735{margin-bottom: 35px !important;}&#8221;][vc_media_grid element_width=&#8221;6&#8243; item=&#8221;mediaGrid_FadeInWithIcon&#8221; initial_loading_animation=&#8221;flipInX&#8221; grid_id=&#8221;vc_gid:1538635821554-e91ea469-c322-7&#8243; include=&#8221;7191,7186&#8243;][\/vc_column][\/vc_row]<\/p>","protected":false},"excerpt":{"rendered":"<p>Works in an electrical and air conditioning installation for a paint building in an automotive factory.<\/p>\n","protected":false},"author":3,"featured_media":7190,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false},"categories":[35],"tags":[],"class_list":["post-5761","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyectos-energia","description-off"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/posts\/5761","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/comments?post=5761"}],"version-history":[{"count":0,"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/posts\/5761\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/media\/7190"}],"wp:attachment":[{"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/media?parent=5761"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/categories?post=5761"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.imesapi.es\/en\/wp-json\/wp\/v2\/tags?post=5761"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}